Infrastructure & Energy

Team infrastructure and energy has more than 15 years of approval experience:

  • 50 stations
  • 100 km railway tunnels
  • 900 km certified tracks

More than 270 projects are mainly executed in Austria, Germany, Hungary and Switzerland.

Some highlights:



© BBT SE


  • Brenner Basistunnel
    EC-verification for TSI INF, ENE and CCS building permission and change approval

    National verification according to §31a EisbG for design and several modification approvals for structural engineering, electrical engineering and safety systems

    Link to the existing railway bypass tunnel in Innsbruck; risk evaluation for level crossings




© CTE





  • Freight terminal Enns
    EC-verification according to TSI INF and ENE for the extension of the rail infrastructure




© DB





  • VDE Erfurt – Eisenach
    EC-verification, upgrade to v = 200 km/h
  • ABS Oldenburg - Wilhemshaven expansion stage III
    EC-verification according to TSI ENE, track electrification
  • Rhein-Ruhr-Express PA 1.2 und 1.3
    EC-verification for subsystems infrastructure (TSI INF and TSI PRM) as well as energy (TSI ENE)
  • Railway bridges
    EC-verification according to TSI INF - more than 20 projects completed, more than 30 are currently ongoing
  • Stations
    EC-verification according to TSI PRM.
    About 20 stations have been certified positivly, more than 25 projects are currently ongoing.

    Some highlights: Dresden, Berlin Zoo, Elsterwerda, Ulm, Heilbronn




© EBE Solutions



  • Safety system for railway crossings ISIS-LC with SIL 2
    Assessment according to CENELEC EN 50129




© GKB





  • GKB Servicehall
    National verification according to §31a and §34b EisbG




© Holding Graz


  • Overhead contact line for the tramway in the city of Graz
    Periodic assessments of overhead contact line network according to §19 EisbG
  • Reversion loop line 3
    National verification according to §31a EisbG
  • Local traffic hub city of Graz
    National verification according to §34b EisbG
  • Extension of tram line 7
    National verification according to §31a EisbG




© NIF


  • Budapest - Székesfehérvár
    EC-verification according to TSI INF, PRM and ENE
  • Balaton I + II
    EC-verification according to TSI INF, PRM and ENE
  • Rákos - Hatvan
    EC-verification according to TSI INF, PRM, ENE and CCS
  • Modernisation of South-Danube bridges
    EC-verification according to TSI INF and ENE
  • Püspökladány - Ebes
    EC-verification according to TSI INF, PRM, ENE and CCS
  • Kelenföld – Százhalombatta
    EC-verification according to TSI INF, PRM, ENE snd CCS
  • Szajol - Püspökladány
    EC-verification according to TSI INF, PRM and ENE


© ÖBB


  • Modification and barrier-free access Penzing station
    EC-verification according to TSI INF, PRM and ENE as well as national verfication according to §31a EisbG in the fields of railway contruction, safety and telecommunications
  • Modification St. Egyden station
    EC-verification according to TSI INF, PRM, ENE as well as national verfication according to §31a and §34b EisbG
  • Barrier-free access of Melk station
    EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a and §34b EisbG
  • Modification Salzburg station 2016 awarded as the most beautiful station in Austria
    EC-verification according to TSI PRM
  • Junction Ostbahn-Flughafenschnellbahn
    National verification according to §31a and §34b EisbG
  • Modification Blumental station
    National verification according to §34b EisbG
  • Freight terminal Wolfurt and Landgraben Wolfurt
    EC-verification according to TSI INF and ENE as well as national verification according to §31a and §34b EisbG
  • Modifications of Neunkirchen, Bruck/Leitha and Leobersdorf stations
    National verification according to §31a EisbG
  • Modification Mattersburg station
    National verification according to §31a EisbG
  • Modification Attnang-Puchheim station
    National verification according to §31a EisbG
  • Koralm line Graz - Klagenfurt
    EC-verification according to TSI INF, PRM, SRT, ENE and CCS; full line including Koralm tunnel (32,9km) and ETCS-trackside equipment
  • Lainz tunnel
    EC-verification according to TSI INF, SRT and ENE; 12km tunnel including switch hall (connection Lainz tunnel to Wienerwald tunnel)
  • Wienerwald tunnel
    EC-verification according to TSI INF and SRT; Wienerwald tunnel section east




©Swietelsky


  • Gyoma-Bekescsaba
    EC-verification according to TSI INF, PRM and ENE; upgrade of 40 km double-track line to 160 km/h including 4 stations
  • Station Vac
    EC-verification according to TSI INF and ENE




© WTB


  • New construction private rail link Schönau
    National verification according to §31a and §34b EisbG
  • New construction private rail link Wopfinger
    National verification according to §31a and §34b EisbG