Arsenal Race / Arsenal Railway Certification GmbH
  • Home
  • Services
    • Notified Body (NoBo)
      • EC-verification
      • List of EC-verifications
      • Guidelines and TSIs
        • Infrastructure
        • Energy
        • Control-command and signalling
        • Rolling stock
    • Designated Body in Austria (DeBo)
    • CSM Assessment Body (AsBo)
    • Independent Safety Assessor (ISA)
    • Designated Body in Switzerland (DeBo)
  • References
    • Companies
    • Subgroups
      • Infrastructure and energy
      • Rolling stock
      • Signal and safety systems
    • Authorizations
      • Notified Body (NoBo)
      • Designated Body in Austria (DeBo)
      • CSM Assessment Body (AsBo)
      • Independent Safety Assessor (ISA)
      • Designated Body in Switzerland (DeBo)
  • About us
    • Team & Jobs
    • Authorizations
      • Notified Body (NoBo)
      • Designated Body in Austria (DeBo)
      • Accredited Body
      • Designated Body in Switzerland (DeBo)
      • Consulting engineers for railway engineering
  • Contact
  • English
    • Deutsch
    • Français
  • Search
  • Menu

Brake pad subsitution ICE-T BR411/Rh4011

Vehicle Desiro Mainline | Train protection, data radio communication, voice radio communication

Vehicle ICx BR 412/812 for DB Fernverkehr | Train protection, data radio communication, voice radio communication

Double-deck train KISS | WESTbahn 1, 2 and 3

Multi-system multiple unit EC250

Locomotive EURODUAL 9000

Vehicle Vectron X4 Baseline change

Pages

  • Team & Jobs
  • Authorizations
  • Companies
  • Home
  • Home
  • Infrastructure and energy
  • Notified Body
  • Notified Body (“NoBo”)
  • Notified Body (NoBo)
  • Notified Body (NoBo)
  • Accredited Body
  • Designated Body (BBS, “DeBo”)
  • Designated Body in Austria (DeBo)
  • Notified Body (“NoBo”)
  • Notified Body (NoBo)
  • Rolling stock
  • Services
  • Subgroups
  • Authorizations
  • CSM Assessment Body (“AsBo”)
  • CSM Assessment Body (AsBo)
  • Designated Body (“DeBo”)
  • Designated Body in Austria (DeBo)
  • Designated Body in Switzerland (DeBo)
  • EC-verification
  • References
  • Signal and safety systems
  • About us
  • Consulting engineers for railway engineering
  • Independent Safety Assessor (ISA)
  • List of EC-verifications
  • Authorized expert
  • Contact
  • Guidelines and TSIs
  • Sitemap EN
  • Designated Body in Switzerland (DeBo)
  • Disclaimer
  • Infrastructure
  • Data protection
  • Energy
  • Control-command and signalling
  • Rolling stock
  • CSM Assessment Body (AsBo)
  • Designated Body (“DeBo”)
  • Independent Safety Assessor (ISA)
  • Designated Body in Switzerland (DeBo)
  • Authorized expert
  • CSM Assessment Body (“AsBo”)

Categories

  • No categories

Archive

    Arsenal Railway Certification GmbH
    Floridsdorfer Hauptstraße 30, 1210 Wien, Österreich

    Services

    • Benannte Stelle (NoBo)
      • EG-Prüfverfahren
      • Richtlinien und TSIs
      • Liste der EG-Prüfungen
    • Unabhängiger Sicherheitsgutachter (ISA)
    • CSM Bewertungsstelle (AsBo)
    • Benannte beauftragte Stelle (BBS) in der Schweiz (DeBo)

    Competences

    • Benannte Stelle (NoBo)
    • Akkreditierte Stelle
    • Benannte beauftragte Stelle in der Schweiz (DeBo)
    • Ingenieurbüro für Verkehrswesen und Verkehrswirtschaft

    References

    • Unternehmen
    • Fachbereiche
    • Befugnisse

    Arsenal Railway Certification GmbH

    Floridsdorfer Hauptstraße 30
    1210 Wien, Österreich

    T +43 1 2580112
    F +43 1 2580112-10
    office@arsenalrace.at

    Arsenal Railway Certification Schweiz AG
    Victor von Bruns-Strasse 19, 8212 Neuhausen am Rheinfall, Schweiz

    © Copyright - Arsenal Railway Certification GmbH - Agentur: rechnerherz
    • Disclaimer
    • Data protection
    • Sitemap
    • Deutsch
    • English
    • Français
    Scroll to top