ABS Oldenburg – Wilhemshaven extension level III
- EC-verification according to TSI ENE, track electrification
ABS Stelle – Lüneburg
- EC-verification according to TSI CCS, trackside equipment ETCS Level 2
Brake pad subsitution ICE-T BR411/Rh4011
- EC-verification according to TSI Loc&Pas according to Notified National Technical Rules (NNTR) for Austria
Erzingen – Konstanz: Sections Thayngen – Gottmadingen – Singen
- EC-verification according to TSI CCS, trackside equipment ETCS Level 1 limited supervision
OTE 3, Onboard Transmission Equipment
- EC-verification of conformity subset 36 and 85 as part of the IOP constituent "ETCS (vehicle)"
Power supply systems of ABS 48
- Independent safety assessment according to CSM regulation
Railway bridges
- EC-verification according to TSI INF - more than 20 projects completed, more than 30 are currently ongoing
Rhein-Ruhr-Express PA 1.2 and 1.3
- EC-verification according to TSI INF, PRM and ENE
Stations
- EC-verification according to TSI PRM. About 40 stations have been certified positivly, more than 25 projects are currently ongoing.
Some highlights are: Dresden, Berlin Zoo, Elsterwerda, Ulm, Heilbronn
Train detection ABS 4 Eschweiler – Aachen as well as axle couting system Eschweiler station
- EC-verification according to TSI CCS
Train detection electronic interlocking system Osnabrück, axle counting system Bohmte – Drohne – Lemförde – Lembruch
- EC-verification according to TSI CCS
VDE Erfurt – Eisenach
- EC-verification Erfurt – Eisenach, upgrade to v = 200 km/h