Alptrans modification of assembly hall Wien West
- National verification according to §31a Austrian Railway Act
Compliance review of BMVIT guide for railway control systems with signalling devices
- National verification according to CENELEC EN 50126, EN 50128 and EN 50129
Education campus St. Pölten
- National verification according to §31a Austrian Railway Act
ETCS L1, ÖBB contract section 4, Attnang-Puchheim – Salzburg
- EC-verification according to TSI CCS as well as national verification according to §34b Austrian Railway Act
ETCS L1, ÖBB contract section 5, Wels – Passau
- EC-verification according to TSI CCS as well as national verification according to §34b Austrian Railway Act
ETCS L2, ÖBB, Brenner – Kufstein (Kiefersfelden)
- EC-verification according to TSI CCS
ETCS L2, ÖBB, new link Wien – St. Pölten
EC-verification according to TSI CCS
Freight terminal Wolfurt
- EC-verification according to TSI INF and ENE as well as national verification according to §31a and §34b Austrian Railway Act
Junction Ostbahn-Flughafenschnellbahn
- National verification according to §31a and §34b Austrian Railway Act
Koralm line Graz – Klagenfurt
- EC-verification according to TSI INF, PRM, SRT, ENE and CCS; full line including Koralm tunnel (32,9km) and ETCS-trackside equipment
Lainz tunnel
- EC-verification according to TSI INF, SRT and ENE; 12km tunnel including switch hall (connection Lainz tunnel to Wienerwald tunnel)
Linz station
- EC-verification according to TSI INF and ENE
Modification and barrier-free access Penzing station
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a Austrian Railway Act in the fields of railway construction, safety and telecommunications
Modification Attnang-Puchheim station
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a Austrian Railway Act
Modification Blumental station
- National verification according to §34b Austrian Railway Act
Modification Mattersburg station
- National verification according to §31a Austrian Railway Act
Modification Schärding station – trackside ETCS level 1 equipment
- National verification according to §34b Austrian Railway Act
Modification St. Egyden station
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a and §34b Austrian Railway Act
Neunkirchen, Bruck/Leitha, Leobersdorf, Melk and other stations
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a and §34b Austrian Railway Act
New construction maintenance base Werndorf
- National verification according to §31a Austrian Railway Act
Operation management center Wien east 2 and Spittal
- National verification according to §31a Austrian Railway Act
Pottendorf line – Hennersdorf – Münchendorf
- EC-verification according TSI INF, PRM, ENE as well as national verification according to §31a and §34b Austrian Railway Act
Power station Obervellach II
- National verification according to §31a Austrian Railway Act
Salzburg and Graz station
- EC-verification according to TSI INF, PRM and ENE
Semmering tunnel
- EC-verification according to TSI INF, SRT and ENE
Shunting yard Kledering – Modification and extension of operations building II
- National verification according to §31a Austrian Railway Act
Stations Kapfenberg, Peggau-Deutschfeistritz and Mürzzuschlag location development
- National verification according to §31a Austrian Railway Act
Wienerwald tunnel
- EC-verification according to TSI INF and SRT; Wienerwald tunnel section east