Your partner for
Infrastructure & Energy
Team infrastructure and energy has more than 15 years of approval experience:
- 50 stations
- 100 km railway tunnels
- 900 km certified tracks
More than 270 projects are mainly executed in Austria, Germany, Hungary and Switzerland.
Some highlights (To find out more please choose the relevant company logo):
Brenner Basistunnel
- National verification according to §31a Austrian Railway Act for design approval as well as several modification approvals for structural engineering, electrical engineering and safety systems
Brenner Basistunnel
- Link to the existing railway bypass tunnel in Innsbruck; risk evaluation for level crossings
Brenner Basistunnel
- EC-verification for TSI INF, ENE and CCS for building permission and change approval
Freight terminal Enns
- EC-verification according to TSI INF and ENE for rail infrastructure extension
ABS Oldenburg – Wilhemshaven extension level III
- EC-verification according to TSI ENE, track electrification
Power supply systems of ABS 48
- Independent safety assessment according to CSM regulation
Railway bridges
- EC-verification according to TSI INF - more than 20 projects completed, more than 30 are currently ongoing
Rhein-Ruhr-Express PA 1.2 and 1.3
- EC-verification according to TSI INF, PRM and ENE
Stations
- EC-verification according to TSI PRM. About 40 stations have been certified positivly, more than 25 projects are currently ongoing.
Some highlights are: Dresden, Berlin Zoo, Elsterwerda, Ulm, Heilbronn
VDE Erfurt – Eisenach
- EC-verification Erfurt – Eisenach, upgrade to v = 200 km/h
GKB servicehall
- National verification according to §31a and §34b Austrian Railway Act
Extension of tram line 7
- National verification according to §31a Austrian Railway Act
Local traffic hub city of Graz
- National verification according to §34b Austrian Railway Act
Overhead contact line for the tramway in the city of Graz
- Periodic assessment of overhead contact line network according to §19 Austrian Railway Act
Reversion loop line 3
- National verification according to §31a Austrian Railway Act
Road and railway bridges as well as bridge re-construction program (section I/1, line Budapest – Pécs)
- EC-verification according to TSI INF and ENE
Székesfehérvár station
- EC-verification according to TSI INF
Alptrans modification of assembly hall Wien West
- National verification according to §31a Austrian Railway Act
Education campus St. Pölten
- National verification according to §31a Austrian Railway Act
Freight terminal Wolfurt
- EC-verification according to TSI INF and ENE as well as national verification according to §31a and §34b Austrian Railway Act
Junction Ostbahn-Flughafenschnellbahn
- National verification according to §31a and §34b Austrian Railway Act
Koralm line Graz – Klagenfurt
- EC-verification according to TSI INF, PRM, SRT, ENE and CCS; full line including Koralm tunnel (32,9km) and ETCS-trackside equipment
Lainz tunnel
- EC-verification according to TSI INF, SRT and ENE; 12km tunnel including switch hall (connection Lainz tunnel to Wienerwald tunnel)
Linz station
- EC-verification according to TSI INF and ENE
Modification Attnang-Puchheim station
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a Austrian Railway Act
Modification St. Egyden station
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a and §34b Austrian Railway Act
Neunkirchen, Bruck/Leitha, Leobersdorf, Melk and other stations
- EC-verification according to TSI INF, PRM and ENE as well as national verification according to §31a and §34b Austrian Railway Act
New construction maintenance base Werndorf
- National verification according to §31a Austrian Railway Act
Operation management center Wien east 2 and Spittal
- National verification according to §31a Austrian Railway Act
Pottendorf line – Hennersdorf – Münchendorf
- EC-verification according TSI INF, PRM, ENE as well as national verification according to §31a and §34b Austrian Railway Act
Power station Obervellach II
- National verification according to §31a Austrian Railway Act
Salzburg and Graz station
- EC-verification according to TSI INF, PRM and ENE
Semmering tunnel
- EC-verification according to TSI INF, SRT and ENE
Shunting yard Kledering – Modification and extension of operations building II
- National verification according to §31a Austrian Railway Act
Stations Kapfenberg, Peggau-Deutschfeistritz and Mürzzuschlag location development
- National verification according to §31a Austrian Railway Act
Gyoma-Bekescsaba
- EC-verification according to TSI INF, PRM and ENE; upgrade of 40 km double-track line to 160 km/h including 4 stations
Station Vac
- EC-verification according to TSI INF and ENE
New construction private rail link Schönau
- National verification according to §31a and §34b Austrian Railway Act
New construction private rail link Wopfinger
- National verification according to §31a and §34b Austrian Railway Act
Arsenal Railway Certification GmbH
Floridsdorfer Hauptstraße 30, 1210 Wien, Österreich
Services
Competences
References
Arsenal Railway Certification GmbH
Floridsdorfer Hauptstraße 30
1210 Wien, Österreich
T +43 1 2580112
F +43 1 2580112-10
office@arsenalrace.at
Arsenal Railway Certification Schweiz AG
Victor von Bruns-Strasse 19, 8212 Neuhausen am Rheinfall, Schweiz